US$ 11.00
1" Compression point Compression Points Remove the point
$135.31
Description
Remove the point
1) The compression point is removed in the exit pit
Digging Bar Hook
3/4 - 1" (PVC) Push Cap
After the Push Point is attached the pipe then this assembly is shoved into the hole made by the compression point
1" Compression point Compression Points Remove the pointThe compression point is the first part to go through the ground and is attached to the Master shaft or quick shaft. It breaks rocks, splits roots and other debris as it makes its way under the pavement and opens a hole larger than the shafts. It is actually 1 3 4" in diameter and will make a hole large enough to accommodate a 1" Sch 40 pipe with a coupling.
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.
You may also like
US$ 18.00
US$ 10.00
US$ 12.00
US$ 98.00
US$ 105.00
US$ 35.00
US$ 12.00
US$ 10.00
US$ 13.00