Electronic railway equipment. Train communication network (TCN) - Wire Train Bus conformance testing Ingestion-build-68772 9 Preparation of test chamber
$174.00
Description
9 Preparation of test chamber
Secondary satisfaction scores
or by one of the SLPs negotiating the use of these procedures
Boats outside these types or outside of Type IX and Type X
This part of ISO/IEC 14143 establishes a framework for verifying the statements of an FSM Method and/or for conducting tests requested by the verification sponsor
Electronic railway equipment. Train communication network (TCN) - Wire Train Bus conformance testing Ingestion-build-68772 9 Preparation of test chamber1 Scope This part of IEC 61375 applies to all equipment and devices implemented according to IEC 6137521, i. e. it covers the procedures to be applied to such equipment and devices when the conformance should be proven. The applicability of this standard to a TCN implementation allows for individual conformance checking of the implementation itself and is a pre requisite for further interoperability checking between different TCN implementations. NOTE
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.